Thursday, March 28, 2013

2x4 Flag

Here is my version of the 2x4 flag :-)
G voted to not distress the edges and add the bow on top.
Now I can't wait for July!
We will be taking a short vacation this weekend so I won't be posting next week, but! I have orders already in and will starting those after vacation.

Happy Easter everyone!

Monday, March 25, 2013

2x4 Fun!

This weeks projects are created from 2x4s! 
Both of these ideas I are gonna be for our house, they have been on the back burner for quite a while while I filled orders.  Since my orders are currently caught up I though this week I'd catch up on these!


Saturday, March 23, 2013

Quick Craft: Coffee Mugs

I finally gave custom coffee mugs a try!  Deciding what type of font to use was probably the hardest part of this whole project :-)  I practiced a few times on a piece of paper then wrote on the mugs. I then baked them at 400 degrees for 40 minutes as shown in this tutorial.  Even though it takes some time to bake these and let them cool I decided to post as q quick craft because the amount of time I was actively working on them was about 5 minutes.   
I love the shape of these mugs, I kinda wish I was keeping them :-)

Friday, March 22, 2013

Happy Friday! FInished Flur de lis Bar Stools

Here is the end result of my bar stool up cycle.  Personally I'm not a huge fan of how the distressing came out on the seats, but I posted these for sale and they sold in 30 minutes so the distressing was deffinately wasn't a bad idea :-)
After sanding down the stools I painted the legs a satin black (I love this paint by the way, it's the same paint I used on my coffee table project).  The Flur de lis was done in black and gold and the wood was stained with a dark wood stain.  The tops were then sealed with a matte finish.

I was a little sad to see these go but also really happy they were so well received

Tuesday, March 19, 2013

Making Progress :-)

Here are the bar stools with the legs black and the flur de lis solid black, so far I am really pleased with the progress :-)


Sunday, March 17, 2013

Bar Stool Up-Cycle

This weeks project is to refinish 2 of these bar stools.  The wood is in great condition, they are sturdy, and don't rock.  The finish isn't the best though so it's time for a cool new makeover.  
I'm considering doing another Flur de lis project.  I want to paint a black Flur de lis on the seat, with the rest of the seat being stained, and the legs painted black.  Time to get to work :-)

Saturday, March 16, 2013

Saturday!

Today was a great day, the sun was shining, there was a light breeze, and it was 77 degrees outside.  I was a prefect day for tanning and I got some time in today :-)

I started my day off with spin class, always a good way to get moving on a Saturday, getting that heart rate up there.  

Once I got home I was able to complete all 3 of my sign orders, they are now wrapped and ready to go to their new homes :-)

I then started up cycling 2 bar stools, the sanding and base coats are done!  

It was a busy and productive day, a perfect Saturday :-)